Urgent work in the playing field.
Work being undertaken on the drain crossing the playing field.
Published: 20 December 2025
Anyone walking across the playing field today will notice that the ground is a bit churned up around the goal posts and around the community hall.
Unfortunately, we have had a blocked drain at the Hatherell Road side of the field which was backed up all the way to the Community Hall/Sports and Social Club. After a bit of calling round we actually found a company that was prepared to bring a vehicle onto the field with the equipment to jet out the blocked gulley and after 6 hours of working the gulleys they were finally cleared – thank you Total Drainage Ltd.
In doing this work on a very wet field this has churned things up a bit and the area behind the goal is a very uneven, but we have this in hand to be tidied up, so please bear with us until that is done.